Downtown Algonquin Construction Update (from Public Works):

This week, crews continued installing the sanitary sewer on La Fox River Drive near the lift station. The construction team also finished installing the electric service for the control building.

Next week, the contractor will begin installation of piping inside the lift station wet well. Additionally, crews will make the final connection to the existing sanitary sewer on Center Street - this will conclude all sanitary sewer work.

Note: Construction will pause between Thursday, December 24 and Sunday, December 27. Construction updates will resume after the New Year. Have a healthy, safe and happy holiday season!

Detours and Closures: N. Harrison Street is now open to traffic.

La Fox River Drive between RT 31 and Center Street as well as Center Street north of La Fox River Drive remain closed.

Stage3 Detour map Dec 12.png

Downtown Algonquin Construction Update (from Public Works):

Here's what crews accomplished this week:

Continued installing the sanitary sewer on La Fox River Drive near the lift station.

Poured the slab on grade* for the control building at the lift station.

Finished pouring concrete for the second stage of N. Harrison Street - all pavement and various sidewalk patching is complete.

*A type of foundation

Here's what crews will be working on next week:

Continuing sanitary sewer installation on La Fox River Drive and making the final connection to the existing sanitary sewer on Center Street.

Installing the electrical service for the control building.

Completing all outstanding concrete patchwork on Harrison Street.

Starting landscape restoration on Harrison and Washington streets and remaining parts of La Fox River Drive.

Detours and Closures

N. Harrison Street is open between Algonquin Road and Front Street but is only accessible from Front Street (No access from Algonquin Road).

N. Harrison Street between Front and Edward Streets will remain closed through the middle of next week.

La Fox River Drive between RT 31 and Center Street as well as Center Street north of La Fox River Drive remain closed.

Stage3 Detour map Dec 12.png

Village Meetings - Tuesday, Dec. 15, 2020

Two Village meetings are scheduled for Tuesday, December 15th starting at 7:30 p.m. The Village Board will be approving: previous meeting minutes; bills for payment; ordinance for levy of taxes for 2020; ordinance amend liquor license fee for 2021 renewal; resolution for purchase of a 2021 F550 chassis truck; resolution to up-fit of the utilities on-call truck; resolution to amend resolution 2020-R-30 adding change order for lining of manholes; motion to adopt the 8th continuation of proclamation of local disaster emergency; and an ordinance amending Ch. 43.39 B. annual fee, requiring video gaming terminal operators to share the expense of the establishment video gaming municipal license. Please refer to link for participation details and meeting packet. The Committee of the Whole will meet at 7:45 p.m. or immediately following the board meeting. The agenda includes an agreement with Landscape Concepts for annual tree pruning services. Please refer to the link for meeting details.

https://www.algonquin.org/.../documents/1607698799_31073.pdf

https://www.algonquin.org/.../documents/1607698935_88563.pdf

Construction Update (from Public Works):

Last week, crews made the following progress:

Began the first stage of roadway patching on N. Harrison Street between Algonquin Road and Front Street. Crews will complete this work in two stages to keep access open to businesses.

Finished pouring the footings and foundation walls for the control building at the lift station* site at the intersection of La Fox River Drive and Center Street. The construction team also began installing interior piping inside the lift station wet well.

Began installing the 24” sanitary sewer on La Fox River Drive to make the final connection into the lift station.

*A facility used to move wastewater from lower to higher elevation.

Next week, the contractor will be working on the following projects:

Completing landscaping on S. Harrison Street between Algonquin Road and Washington Street.

Finishing the second stage of pavement patching and sidewalk on N. Harrison Street.

Continuing sanitary sewer work on La Fox River Drive.

Pouring the slab on grade** for the control building and completing all interior piping inside the lift station wet well.

**A type of foundation

Detours and Closures

N. Harrison Street from Algonquin Road to Front Street is closed. All businesses along N. Harrison Street between Front and Edward streets are open and accessible from Edward Street. During the middle of next week, access to businesses will be switched to Front Street.

La Fox River Drive between Main Street/Route 31 and Center Street, as well as Center Street north of La Fox River Drive, are closed. These closures will remain in place through next month.

Please refer to the map below to detour around the closures. Thank you again for your continued cooperation and patience.

Stage 3 Detour Map Dec. 5 .png

Committee of the Whole Meeting - Dec. 8, 2020

The Committee of the Whole meeting will be held held remotely and in-person (limit 10 seats, masks must be worn) at 7:30 p.m. on December 8, 2020. Please refer to the meeting details on the agenda for participation information. Agenda items include: consider liquor license fee reduction program; purchase a utility truck; and amendment to Resolution 2020-R-30, an agreement with Visu-Sewer for sewer lining to now include manhole lining.

https://www.algonquin.org/.../documents/1607108611_07537.pdf

Liquor Commission & Village Board Meeting - Tuesday, Dec. 1, 2020

The Liquor Commission special meeting and Village Board meeting for Tuesday, December 1st will be held remotely, starting at 7:25 p.m. Please refer to the meeting participation details on the agenda page of the meeting packet. The Liquor Commission will consider the relocation of the liquor license for ALDI. The Village Board will be approving H&H Electric agreement for street light maintenance; Memo of understanding with McHenry Co. Dept. of Health for the use of Public Work's facility as a mass vaccination dispensing site; bills for payment and previous meeting minutes. Please refer to the links for meeting agendas and other information.

https://www.algonquin.org/.../documents/1606256264_12555.pdf

https://www.algonquin.org/.../documents/1606255074_02838.pdf

Village Board/Committee of the Whole Meetings - Tuesday, Nov. 17, 2020

The Village Board meeting will be held remotely & in-person (limit 10 people with masks) on Tuesday, November 17, 2020 starting at 7:30 p.m. at 2200 Harnish Drive. Please refer to link for meeting packet containing details on how to participate; call in information; and entire meeting packet. Agenda items include: 5 year agreement for audit services; accepting the Police Pension Municipal Compliance Report; 2020 property tax levy; purchase telehandler; Woods Creek lift station design services; purchase hook lift truck; purchase a HV607 truck; purchase 2 police hybrid SUVs; 1 police car admin car; purchase Brazo software; approve bills & payroll; and approve prior meeting minutes. The Committee of the Whole meeting will start at 7:45 p.m. or immediately following the prior meeting. Agenda items include: agreement with H&H Electric for street light maintenance and an intergovernmental agreement with McHenry Co. Dept of Health for use of the Public Works facility as COVID-19 vaccine distribution location. Please refer to link for meeting packet.

https://www.algonquin.org/eg…/documents/1605281626_80631.pdf
https://www.algonquin.org/eg…/documents/1605291761_04036.pdf

Committee of the Whole Meeting - Tuesday, November 10

The Committee of the Whole meeting scheduled for Tuesday, November 10 will be held remote/in-person starting at 7:30 p.m. Please read the agenda for details regarding participation; listening to meeting; or attending the meeting. Items being discussed include: agreement with Sikich for audit services; Municipal Compliance Report; Police Pension Fund tax levy; 2020 property tax levy; surplus items; purchase of a tele-handler; Woods Creek lift station design services; and the purchase of other Public Works equipment & vehicles. Please refer to attached link for meeting packet details.

https://www.algonquin.org/egov/documents/1604679231_3871.pdf

Construction Progress (from Public Works)

This week, crews made the following progress:

Completed sewer and water main work on S. Harrison Street. Crews will complete remaining sewer and water main work south of Algonquin Road (at the intersection of La Fox River Drive and Center Street) as they construct the lift station in the coming weeks.

Restored significant portions of the landscape (or parkway) on La Fox River Drive, Washington and Madison streets. The contractor will be watering the restored areas for the next several weeks until the ground freezes.

Removed old pavement and prepared the base for asphalt paving along La Fox River Drive, Washington (from La Fox River Drive to S. Harrison Street) and Madison streets (La Fox River Drive to mid-block).

Resurfaced Algonquin Road between Main Street and the Fox River bridge in coordination with IDOT's bridge project.

Finished installing the earth retention system* for the excavation of the lift station wet well. Work on the lift station at the intersection of La Fox River Drive and Center Street will continue for the next several weeks.

*A temporary support structure for the lift station

Here's what's coming up next week:

Crews will start installing the sanitary sewer along N. Harrison Street beginning at Algonquin Road and progressing north to Front Street. Restaurants and business along N. Harrison Street in the work area will remain open and accessible. Please follow the detour to Edward Street.

The construction team will complete initial paving on La Fox River Drive, Washington (La Fox River Drive to S Harrison Street) and Madison streets (La Fox River Drive to mid-block) early next week; then crews will adjust the completed manhole frames. The contractor expects to finish paving by the end of the week.

Crews will begin patching the roadway and sidewalk along Washington Street (from S. Harrison to S. Main streets) and S. Harrison Street (from Washington Street to Algonquin Road). To keep the public parking lots on Harrison Street open to the public, crews will patch Harrison Street first. The lots will then be accessible on Harrison Street while crews work on Washington Street.

http://oldtownalgonquin.org/stage-3-south-harrison-street...

Detours and Closures

S. Harrison Street between Washington Street and Algonquin Road is closed. N. Harrison Street from Algonquin Road to Front Street is also closed. All businesses along N. Harrison Street between Front and Edward streets are open and accessible from Edward Street.

Washington Street is closed between Main Street and La Fox River Drive. However, the intersection at Washington and Harrison streets is open so that residents can access the public parking lot.

Please refer to the map below to detour around the closures. Thank you again for your continued cooperation and patience.

Suggested hours for trick-or-treating in #Algonquin will be on Saturday, October 31 from 3PM to 7PM. for those choosing to participate. #Halloween is an important tradition in Algonquin, which, like many other events this year, will be impacted by the COVID-19 pandemic. As such, we encourage individuals to take extra precautions as well as review the associated risks and guidance from the CDC and the Illinois Department of Public Health (IDPH).

Learn more at http://ow.ly/AvmG50C53Qk.

Village Board Meeting - Tuesday, Nov. 3, 2020

The Village Board meeting for Tuesday, Nov. 3rd will be held remotely. Please refer to the attached packet for meeting participation information and agenda details. Agenda items include: agreement with B&B Holiday Decorating for holiday lighting; agreement with EEI for risk and resilience assessment; special event permit & fee waiver for Lion's Club Christmas tree sale at Algonquin State Bank; intergovernmental agreement

with Kane Co. for Corona virus relief funds; approval of prior meeting minutes; and approve monthly bills/payroll expenses. https://www.algonquin.org/.../documents/1604004613_72104.pdf

Stoneybrook Park Construction Update (from Public Works):

Excavating Stoneybrook Park -In the past two weeks, crews have made the following progress:

-Installed 90% of the storm sewer pipes to protect the park from rain events.

-Connected the water main for the new water fountain.

-Installed an electrical box that will deliver electricity for the pavilion.

-Installed concrete curb around the park and started installing curb around the playground.

-Began excavating the old volleyball court

Over the next few weeks, the contractor will install new concrete curb around the north side of the parking lot and the bocce ball court.

http://stoneybrookparkproject.org/index.html

Construction Update (from Public Works):

This week, crews made the following progress:

Finished installing the water main and sanitary sewer along Washington Street between S. Harrison and S. Main streets. The final water main connection at the intersection of Washington and S. Harrison streets will be completed early next week.

Continued installing the sanitary sewer along S. Harrison Street between Washington Street and Algonquin Road. The contractor expects to complete this work by the end of next week, which wraps up sanitary sewer installation work south of Algonquin Road.

Started installing the earth retention system, a temporary support structure for the lift station to be installed at the intersection of La Fox River Drive and Center Street. Crews will continue this work next week.

Replaced the curbs, sidewalks and driveway aprons* along Madison and Washington streets and La Fox River Drive.

Began landscape restoration along La Fox River Drive. The contractor will continue this work next week, weather permitting.

Here's what's coming up next week:

The contractor plans to begin roadway restoration work, which includes grinding out the existing pavement and gravel along the following roads: La Fox River Drive, Washington Street from Main Street to La Fox River Drive, Madison Street from La Fox River Drive to 8 Madison Street. On-street parking on these streets will be prohibited while crews are on site. The contractor will provide advance notice of any vehicle access restrictions.

In coordination with IDOT’s bridge project, the contractor will be grinding and resurfacing Algonquin Road from Main Street to the end of the IDOT bridge construction area. The contractor expects to finish this work in just a few days. Afterward, IDOT’s contractor will complete the pavement markings for their project.

Crews will be installing dewatering well points along N. Harrison Street between Algonquin Road and Front Street. These wells will lower the groundwater to help crews install the last segment of the sanitary sewer. Once the wells are operational, it will take approximately one week before the contractor can begin the sewer installation.

*The approach where the road and driveway meet.

http://oldtownalgonquin.org/stage-3-south-harrison-street...

Note: The parking lots along S. Harrison Street remain open. Motorists may enter the parking lots through the temporary access ramp installed on Washington Street or from S. Harrison Street (see map below).

Detours and Closures

S. Harrison Street between Washington Street and Algonquin Road is closed. N. Harrison Street from Algonquin Road to Front Street is also closed. All businesses along N. Harrison Street between Front and Edward streets are open and accessible from Edward Street.

Washington Street is closed between Main Street and La Fox River Drive. However, the intersection at Washington and Harrison streets is open so that residents can access the public parking lot.

Note: Please pay close attention to the flaggers during repaving work on Algonquin Road late next week.

Stoneybrook Park Reconstruction

Are you ready for a park makeover? Construction is underway as crews transform Stoneybrook Park (1200 N Huntington Dr.) into a full-service community park with brand new games, courts and trail!

The park will feature a basketball court, bocce ball courts, pickleball courts, a gaga ball pit, picnic shelter, walking trail and a 15-space parking lot, and the current volleyball court and playground will be replaced. Construction is expected to be complete by summer 2021.

Follow the project’s progress by signing up for email updates: http://stoneybrookparkproject.org/stay-connected.html

Village Board & Committee of the Whole Meetings - Tuesday, Oct. 20, 2020

A Village Board meeting and Committee of the Whole meeting are scheduled for Tuesday, October 20th starting at 7:30 p.m. The meetings will be held remotely and in-person (limit 12 people, masks must be worn). Please refer to the link for the agenda and meeting packet details. The Committee of the Whole meeting will begin at 7:45 p.m. or immediately following the conclusion of the Village Board meeting. Agenda items include: permit for the Lions Club Christmas tree sale; amendment to Ch. 23, Building Codes & Appendix B, Penalty, Salary, Bonds and Fees of the Municipal Code; review the townhomes proposal; agreement with B&B Holiday Decorating of Des Plaines for holiday lighting and agreement with EEI for risk & resilience assessment. Please refer to meeting packet for details. https://www.algonquin.org/.../documents/1602875125_53083.pdf

https://www.algonquin.org/egov/documents/1602875251_34.pdf

Woods Creek Area Construction Update (from Public Works):

Last week, crews paved the parking lot at Ted Spella Park as well as placed the final asphalt surface on Fairway View Drive. Crews also completed various sidewalk repairs throughout the project area and relocated the sheet pilings from the west walls to the east side. These pilings will protect the construction area and creek bed from unstable soil conditions.

This week, crews will return to paving the multi-use path from Woods Creek Lane to Bunker Hill Drive and will begin building the east abutment (support wall) structure. Residents will also see crews regrading (leveling) the creek bed that flows under the new bridge.

If You See Something, Say Something! The construction site has experienced several acts of vandalism lately. Vandalism slows progress and requires the team to redo work. Please notify the police If you see any suspicious or destructive activity.

Road/Path Closure Alert

The multi-use path is closed from Woods Creek Lane to Bunker Hill Drive. Also, Woods Creek Lane is closed due to construction on the bridge-like structure over the creek.

As a reminder, homeowners who have invisible dog fences or sprinklers installed on the public right-of-way will be responsible for any repairs to those items. The Village will not reimburse homeowners for any repairs for personal property installed within the public right-of-way. http://terracehillproject.org/index.html